The challenge
A damaged LT aluminium armoured power cable threatened the site's power supply. The usual route is an external contractor, which means waiting, extended DG running and a large bill.
02
What we did
Our in-house technical team repaired and restored the damaged cable without external contractor support, ensuring uninterrupted power supply.
03
The result
Reduced DG operation and diesel consumption, minimised power interruptions, and significant cost savings through effective in-house maintenance.
More from our sites
- LED chip retrofit instead of fixture replacementExisting fixtures upgraded with LED chip modules rather than replacing whole luminaires, extending service lif...
- Smart water and energy automationPumps, motors, sumps and borewells brought under automated monitoring and control, alongside motion sensors, L...
- Crisis management: COVID-19, Chennai floods and cyclonesThrough lockdowns, floods and cyclones our sites kept essential services running, with site-specific pumps, mo...
Want this kind of engineering on your site?
Tell us about the site and the services you need. We will visit, assess and send a proposal.